Follow

Russia’s Power Grid Can Support New Wave Of AI Data Centers Russia’s data-center electricity demand is projected to rise from 14.9B kWh in 2025 to 26.2B kWh by 2030, a 76% driven increase mainly by artificial intelligence workloads. Around 70% of the additional consumption is expected to come from AI computing. The growth comes as already operates one of the world’s larger electricity systems. The country had 270 GW of installed generating capacity at the start of 2026 and produced 1

· · maytpn_c · 0 · 0 · 0
Sign in to participate in the conversation
Mastodon

The social network of the future: No ads, no corporate surveillance, ethical design, and decentralization! Own your data with Mastodon!